logo
 
TGSPDCL Chairman and Managing Director, Musharraf Faruqui on Tuesday said  that they are working towards the goal of zero interruptions of power supply in Hyderabad city

To achieve this, they have previously issued orders to superintending engineers to conduct inspections up to the distribution transformer level in the LT network and to undertake a special drive to rectify any identified faults.

As part of the special drive, Musharraf Faruqui



along with Director Operations Dr. Narsimhulu conducted inspections on Tuesday morning at 8 am in Gymkhana Section of the Secunderabad circle. 

While interacting with the consumers, they inspected the LT network.

Musharraf Faruqui identified issues such as dangling wires, cables with joints, and HG fuse sets without proper insulation, instructing electricity officials to rectify all these issues by the evening and submit photographs to him as proof.
No Comments For This Post, Be first to write a Comment.
Leave a Comment
Name:
Email:
Comment:
Enter the code shown:


Can't read the image? click here to refresh
etemaad live tv watch now

Todays Epaper

English Weekly

neerus indian ethnic wear
Latest Urdu News

Which Men's cricket team will win the five Test matches series going to be held in UK?

India
England
Can't Say